TELECOMMUNICATION PROJECTS
- 1Supplied 21 Guard shelter for sites for Darin in 2010.2010ProjectSupplied 21 Guard shelter for sites for Darin in 2010.
- 2Supplied Grounding system materials for 200 GSM sites for EMEK in 2009.2009ProjectSupplied Grounding system materials for 200 GSM sites for EMEK in 2009.
- 3Supplied 20 monopole GSM tower for Darin.—ProjectSupplied 20 monopole GSM tower for Darin.
- 4Supplied 10 lattice 4 legs tower for Darin.—ProjectSupplied 10 lattice 4 legs tower for Darin.
- 5Supplied tower lighting for 150 sites for Darin in 2009.2009ProjectSupplied tower lighting for 150 sites for Darin in 2009.
- 6Supplied tower lighting and Flashers for 100 sites to Korek telecom.—ProjectSupplied tower lighting and Flashers for 100 sites to Korek telecom.
- 7Supplied 1620 Battery (155AH, NSB) North star for Korek from NSB USA.—ProjectSupplied 1620 Battery (155AH, NSB) North star for Korek from NSB USA.
- 8Supplied 1530 Kathrien GSM Antenna to Darin co. from Germany by more than 2MUSD.—ProjectSupplied 1530 Kathrien GSM Antenna to Darin co. from Germany by more than 2MUSD.
- 9Supplied 160 GSM shelter to Mustafa co. in Sulemani with high quality in 2010.2010ProjectSupplied 160 GSM shelter to Mustafa co. in Sulemani with high quality in 2010.
- 10Supplied SFP and fiber connector to Korek in 2011.2011ProjectSupplied SFP and fiber connector to Korek in 2011.
- 11Supplied one site master Anritsu to Alsahla co. in Sulamania at 2011.2011ProjectSupplied one site master Anritsu to Alsahla co. in Sulamania at 2011.
- 12Fix very important main transmission Back bone of Korek network… (67 Xpic Ericsson SDH) and fix problem and mistake of them.—ProjectFix very important main transmission Back bone of Korek network from Masif -Kirkuk Baghdad and Massif – Mosel-Baghdad routs and from Baghdad-Babil_Basra and Bagahdd_Wast_Basra and Baghdad-Anbar till Jordan boarder routs, which was 67 Xpic Ericsson SDH and fix problem and mistake of them.
- 13Doing some SDH space diversity for NSN (Nokia Siemens) co between Baghdad and Basra.—ProjectDoing some SDH space diversity for NSN (Nokia Siemens) co between Baghdad and Basra.
- 14Fix and maintenance of 13 sites in Sulymnia for Korek telecom 2015.2015ProjectFix and maintenance of 13 sites in Sulymnia for Korek telecom 2015.
- 15Dismantle and install new 3 sites in Baghdad.—ProjectDismantle and install new 3 sites in Baghdad.
- 1631KM fiber optic turnkey project from Pirmam to Erbil.—Project31KM fiber optic turnkey project from Pirmam to Erbil.
- 1721 Km Erbil ring fiber optic for Korek telecom.—Project21 Km Erbil ring fiber optic for Korek telecom.
- 18Test crude oil and give them treatment for H2s scavenger for khormala and Taqtaq field and Kevergosk refinery.—ProjectTest crude oil and give them treatment for H2s scavenger for khormala and Taqtaq field and Kevergosk refinery.
- 19Supply more than 1000 Drum chemical treatment (H2s scavenger, Biocide, Demulsifire, anti foam, …) from Nalco USA.—ProjectSupply more than 1000 Drum chemical treatment (H2s scavenger, Biocide, Demulsifire, anti foam, ……) from Nalco USA.
- 20Supply chemical injection for khormala field.—ProjectSupply chemical injection for khormala field.
- 21Supply special pipes and fitting and flange and elbow for KAR company.—ProjectSupply special pipes and fitting and flange and elbow for KAR company.
- 22Maintenance 13 of 13 tower GF from KOREK Sulaymania sites November 2015.2015ProjectMaintenance 13 of 13 tower GF from KOREK Sulaymania sites November 2015.
- 23Technical maintenance korek in 17 sites at 2 project in Baghdad 2016.2016ProjectTechnical maintenance korek in 17 sites at 2 project in Baghdad 2016.
- 24EPC 2 Telecom Towers, 40m & 50m height, for DNO-KOREK.—ProjectEPC 2 Telecom Towers, 40m & 50m height, for DNO-KOREK.
