OIL AND GAS PROJECTS


Oil & Gas Projects

  • 1
    Khormala – Kalak 24” Oil Pipeline
    Erbil – Iraq
    40 km
    ScopeWelding, Tie-in, Lowering, Bending, Coating
  • 2
    Kalak – Alqosh 36” Oil Pipeline
    Duhok – Iraq
    80 km
    ScopeWelding, Tie-in, Lowering, Bending, Coating
  • 3
    Semel – Fishkhabour 36” Oil Pipeline
    Zakho – Iraq
    41km
    ScopeWelding, Tie in, lowering, bending, coating
  • 4
    Bandawa–Kashe Power Plant 36” Gas Pipeline
    Duhok – Iraq
    20km
    ScopeWelding, Tie in, lowering, bending, coating
  • 5
    Khormala – Alqosh 24” & 36” Oil Pipeline
    Erbil – Duhok
    120km
    ScopeHydrostatic Test
  • 6
    Semel – Fishkhabour
    Duhok – Iraq
    41km
    Scope36” Oil Pipeline Hydrostatic Test
  • 7
    Semel – Fishkhabour
    Zakho – Iraq
    41km
    Scope36” Oil Pipeline Fiber Optic & C.W.
  • 8
    Kashe Power Plant
    Duhok – Iraq
    Scope36” Valve & Gas Pipeline and Piping
  • 9
    Khormala – Kirkuk 36” Oil Pipeline
    Kirkuk – Iraq
    21km
    ScopeWelding, Tie in, lowering, bending, coating
  • 10
    Khormala – Kalak 36” Oil Pipeline
    Erbil – Iraq
    20km
    ScopeWelding, Tie in, lowering, bending, coating
  • 11
    Fishkhabour – Turkey 40” Gas Pipeline
    Duhok / Zakho
    5.5km
    ScopeWelding, Tie in, lowering, bending, coating
  • 12
    Debes 24” Oil Pipeline
    Kirkuk – Iraq
    4km
    ScopeWelding, Tie in, lowering, bending, coating
  • 13
    CPS – Amin Unit Khormala
    Erbil, Makhmor
    3km
    Scope24” Gas Pipeline, piping & valve installation
  • 14
    Kalak Refinery 12” Oil Pipeline
    Erbil, Kalak
    3.5km
    ScopeWelding, tie-in, lowering, bending, coating
  • 15
    Khormala New Pump Station 2014
    Erbil – Iraq
    ScopeAll valve reducers and piping issues & final hydrostatic test
  • 16
    Fishkhabour – Turkey Side
    Duhok – Iraq
    4.5km
    Scope40” Hydrostatic test gas pipeline
  • 17
    Fishkhabour – Turkey River Crossing
    Duhok – Iraq
    ScopePiping and by-pass connections
  • 18
    Fishkhabour – Two Projects
    Duhok – Iraq
    In Station
    ScopePiping and instrument of oil station, bypass
  • 19
    Khormala New Pump Station
    Erbil, Kalak
    ScopeAll valve reducers and piping issues & final hydrostatic test
  • 20
    Khormala Piping and Pump Station
    Erbil – Iraq
    ScopePipeline, piping, valve, bracket, reducer
  • 21
    Fishkhabour Station
    Duhok – Iraq
    ScopeHot tapping 36” to 40”
  • 22
    Atrush Main Export Pipeline
    Atrush – Iraq
    18.5km
    ScopeROW, trenching, welding, coating, lowering, backfilling
  • 23
    Atrush Main Export Pipeline
    Atrush – Iraq
    Total 6km
    ScopeTemporary roads, access roads
  • 24
    Atrush Road Crossing
    Atrush—Iraq
    4 Crossing
    ScopeTAQA – Valley Crossing, Road Crossing
  • 25
    GIZ—Faida Water Pipeline
    Faida—Duhok
    18 Km
    ScopeWelding, Coating, Testing
  • 26
    GIZ—Faida Water Pipeline
    Faida—Duhok
    14 km
    ScopeAccess Roads, Service Road
  • 27
    Well Pad D
    Sarsang Block
    1 Block
    ScopeHKN – Earth Work, Site Preparation, Concrete Foundation
  • 28
    Main Flow Line for Petoil
    Chia Surkh—Kalar
    2 km
    ScopePETOIL – ROQ, Welding, Testing
  • 29
    EPF Site Preparation
    Chia Surkh—Kalar
    3 Pad
    ScopePETOIL – Site Grading and Leveling, Well Pad Preparation
  • 30
    Well Pad Hook Up Activities
    Tawke—Zakho
    2 Well
    ScopeDNO – Earth Work, Fabrication, Welding, Installation for Piping & Steel Skids.
  • 31
    Supply Valves
    Tawke—Zakho
    67 Valve
    ScopeDNO – Supply 67 Valves with different Sizes and Specifications
  • 32
    16560 – T25N wellhead hook-up & T-11 Manifold extension for T25N tie-in
    Tawke—Zakho
    3 Manifold
    ScopeDNO – T-25N Hook-up & T-11 Manifold extension, Including steel fabrication, piping activities such as fabrication, welding, installation, testing, painting, valve installation, till hand over to client.
  • 33
    16788 – Surface Preparation and Painting of DNO Facilities.
    Tawke—Zakho
    2 Manifold
    ScopeDNO – T22-T23 Manifold extension, Including steel fabrication, piping activities such as fabrication, welding, installation, testing, painting, valve installation, till hand over to client.
  • 34
    17067 – T-8W Wellhead Hook Up Works
    Tawke—Zakho
    1 Manifold
    ScopeDNO – T-8W Hook-up, Including steel fabrication, piping activities such as fabrication, welding, installation, testing, painting, valve installation, till hand over to client.
  • 35
    Pipeline 8" (for HKN-HAVATEK)
    Sarsang – Duhok
    2.4km
    ScopeStringing, bending, welding, testing, lowering, and pigging (all the mechanical Activities.)
  • 36
    PIPING & STRUCTURAL FOR 4TH & 5TH EXPORT OIL PUMPS
    Pishkabir – Zakho
    Export System
    ScopeDNO – CONSTRUCTION SCOPE OF WORK MECHANICAL PIPING & STRUCTURAL FOR 4TH & 5TH EXPORT OIL PUMPS
  • 37
    Oil Terminal EPC- GEG Group – 2020
    KRG – Erbil – Gwer
    12 Tanks
    ScopeGEG Group – EPC for 12 Storage Tanks 5000m³, Floating and Fixed Roof Tanks, Firefighting System, Piping, Loading & Unloading Arms,
  • 38
    Floating Roof Storage Tanks – KAR Group – 2021
    Erbil Khurmala
    3100m³
    ScopeKAR Group – EPC 3100m³, floating Roof storage Tank with all the relative systems, Electrical, Instrumentation, Firefighting System.
  • 39
    Telecom Tower
    Tawke—Zakho
    2 Towers
    ScopeDNO – EPC Telecom Towers, 40m & 50m height.
  • 40
    TAQA – C-Pad Manifold
    Atrush – Duhuk
    1 Skid
    ScopeProduction and Test Manifold
  • 41
    TAQA – C-Pad Permanent Facilities – Interconnecting Piping
    Atrush – Duhuk
    C- Pad
    ScopePermanent Piping Construction, Including steel fabrication, connecting to X-mas tree, Interconnecting piping activities such as fabrication, welding, installation, testing, PWHT, painting, valve installation, till hand over to client,
  • 42
    LANAZ Pipeline Project
    Erbil – Gwer
    8km, Qty 2
    ScopeEPC for the Pipeline from LANAZ Refinery to Main Export Pipeline of KPC, including Hot taping activities and metering Skids.
  • 43
    LANAZ Refinery Extension Project 2023
    Erbil – Gwer
    4 Storage Tanks.
    ScopeLANAZ Refinery – EPC for 4 Storage tanks 25,000m³, and EPC for interconnecting piping activates (8,000 Inch Dia) and the Pipe Racks 550 Ton of steel.
  • 44
    United Refining Company
    Erbil – Qushtabah
    7 Storage Tanks
    ScopeFabrication & Installation of 7 Storage Tank 1350m³
  • 45
    United Refining Company
    Erbil – Qushtabah
    7 Storage Tanks
    ScopeFabrication & Installation of 7 Storage Tank 2500m³
  • 46
    United Refining Company
    Erbil – Qushtabah
    6 Storage Tanks
    ScopeFabrication & Installation of 6 Storage Tank 6000m³
  • 47
    KAR Group
    Kalak Area
    800ml
    ScopeZab River Crossing 36", Fit up, welding, Concrete Casing, and River crossing about 800ml
  • 48
    KAR Group
    Pardarash Area
    400ml
    ScopeKhazir River Crossing 36", Fit up, welding, Concrete Casing, and River crossing about 400ml
  • 49
    United Refining Company
    Erbil – Qushtabah
    80Ton
    ScopeFabrication, Installation of Steel Structural Pipe rack.
  • 50
    Hot tap
    Basrah, Rumailah
    2 Pcs
    ScopeHot tapping operation of point size 8"/12"
  • 51
    Water Pipe Line (Hemn Group)
    Erbil
    67km
    ScopeExecution of 67km Water Pipeline with all the required activities.
  • 52
    KPC Group
    Kalak Area
    550ml
    ScopeZab River Crossing 36", Concrete Casing, and River crossing about 550ml
  • 53
    Erbil Copper & Cable – EEC
    Erbil, Qushtabah
    1 Storage Tanks
    ScopeEngineering, Procurement, Fabrication & Installation of Gasoline Storage Tank 2200m³, with all accessories and FF system and Connections