OIL AND GAS PROJECTS
- 1Khormala – Kalak 24” Oil PipelineErbil – Iraq40 kmScopeWelding, Tie-in, Lowering, Bending, Coating
- 2Kalak – Alqosh 36” Oil PipelineDuhok – Iraq80 kmScopeWelding, Tie-in, Lowering, Bending, Coating
- 3Semel – Fishkhabour 36” Oil PipelineZakho – Iraq41kmScopeWelding, Tie in, lowering, bending, coating
- 4Bandawa–Kashe Power Plant 36” Gas PipelineDuhok – Iraq20kmScopeWelding, Tie in, lowering, bending, coating
- 5Khormala – Alqosh 24” & 36” Oil PipelineErbil – Duhok120kmScopeHydrostatic Test
- 6Semel – FishkhabourDuhok – Iraq41kmScope36” Oil Pipeline Hydrostatic Test
- 7Semel – FishkhabourZakho – Iraq41kmScope36” Oil Pipeline Fiber Optic & C.W.
- 8Kashe Power PlantDuhok – Iraq—Scope36” Valve & Gas Pipeline and Piping
- 9Khormala – Kirkuk 36” Oil PipelineKirkuk – Iraq21kmScopeWelding, Tie in, lowering, bending, coating
- 10Khormala – Kalak 36” Oil PipelineErbil – Iraq20kmScopeWelding, Tie in, lowering, bending, coating
- 11Fishkhabour – Turkey 40” Gas PipelineDuhok / Zakho5.5kmScopeWelding, Tie in, lowering, bending, coating
- 12Debes 24” Oil PipelineKirkuk – Iraq4kmScopeWelding, Tie in, lowering, bending, coating
- 13CPS – Amin Unit KhormalaErbil, Makhmor3kmScope24” Gas Pipeline, piping & valve installation
- 14Kalak Refinery 12” Oil PipelineErbil, Kalak3.5kmScopeWelding, tie-in, lowering, bending, coating
- 15Khormala New Pump Station 2014Erbil – Iraq—ScopeAll valve reducers and piping issues & final hydrostatic test
- 16Fishkhabour – Turkey SideDuhok – Iraq4.5kmScope40” Hydrostatic test gas pipeline
- 17Fishkhabour – Turkey River CrossingDuhok – Iraq—ScopePiping and by-pass connections
- 18Fishkhabour – Two ProjectsDuhok – IraqIn StationScopePiping and instrument of oil station, bypass
- 19Khormala New Pump StationErbil, Kalak—ScopeAll valve reducers and piping issues & final hydrostatic test
- 20Khormala Piping and Pump StationErbil – Iraq—ScopePipeline, piping, valve, bracket, reducer
- 21Fishkhabour StationDuhok – Iraq—ScopeHot tapping 36” to 40”
- 22Atrush Main Export PipelineAtrush – Iraq18.5kmScopeROW, trenching, welding, coating, lowering, backfilling
- 23Atrush Main Export PipelineAtrush – IraqTotal 6kmScopeTemporary roads, access roads
- 24Atrush Road CrossingAtrush—Iraq4 CrossingScopeTAQA – Valley Crossing, Road Crossing
- 25GIZ—Faida Water PipelineFaida—Duhok18 KmScopeWelding, Coating, Testing
- 26GIZ—Faida Water PipelineFaida—Duhok14 kmScopeAccess Roads, Service Road
- 27Well Pad DSarsang Block1 BlockScopeHKN – Earth Work, Site Preparation, Concrete Foundation
- 28Main Flow Line for PetoilChia Surkh—Kalar2 kmScopePETOIL – ROQ, Welding, Testing
- 29EPF Site PreparationChia Surkh—Kalar3 PadScopePETOIL – Site Grading and Leveling, Well Pad Preparation
- 30Well Pad Hook Up ActivitiesTawke—Zakho2 WellScopeDNO – Earth Work, Fabrication, Welding, Installation for Piping & Steel Skids.
- 31Supply ValvesTawke—Zakho67 ValveScopeDNO – Supply 67 Valves with different Sizes and Specifications
- 3216560 – T25N wellhead hook-up & T-11 Manifold extension for T25N tie-inTawke—Zakho3 ManifoldScopeDNO – T-25N Hook-up & T-11 Manifold extension, Including steel fabrication, piping activities such as fabrication, welding, installation, testing, painting, valve installation, till hand over to client.
- 3316788 – Surface Preparation and Painting of DNO Facilities.Tawke—Zakho2 ManifoldScopeDNO – T22-T23 Manifold extension, Including steel fabrication, piping activities such as fabrication, welding, installation, testing, painting, valve installation, till hand over to client.
- 3417067 – T-8W Wellhead Hook Up WorksTawke—Zakho1 ManifoldScopeDNO – T-8W Hook-up, Including steel fabrication, piping activities such as fabrication, welding, installation, testing, painting, valve installation, till hand over to client.
- 35Pipeline 8" (for HKN-HAVATEK)Sarsang – Duhok2.4kmScopeStringing, bending, welding, testing, lowering, and pigging (all the mechanical Activities.)
- 36PIPING & STRUCTURAL FOR 4TH & 5TH EXPORT OIL PUMPSPishkabir – ZakhoExport SystemScopeDNO – CONSTRUCTION SCOPE OF WORK MECHANICAL PIPING & STRUCTURAL FOR 4TH & 5TH EXPORT OIL PUMPS
- 37Oil Terminal EPC- GEG Group – 2020KRG – Erbil – Gwer12 TanksScopeGEG Group – EPC for 12 Storage Tanks 5000m³, Floating and Fixed Roof Tanks, Firefighting System, Piping, Loading & Unloading Arms,
- 38Floating Roof Storage Tanks – KAR Group – 2021Erbil Khurmala3100m³ScopeKAR Group – EPC 3100m³, floating Roof storage Tank with all the relative systems, Electrical, Instrumentation, Firefighting System.
- 39Telecom TowerTawke—Zakho2 TowersScopeDNO – EPC Telecom Towers, 40m & 50m height.
- 40TAQA – C-Pad ManifoldAtrush – Duhuk1 SkidScopeProduction and Test Manifold
- 41TAQA – C-Pad Permanent Facilities – Interconnecting PipingAtrush – DuhukC- PadScopePermanent Piping Construction, Including steel fabrication, connecting to X-mas tree, Interconnecting piping activities such as fabrication, welding, installation, testing, PWHT, painting, valve installation, till hand over to client,
- 42LANAZ Pipeline ProjectErbil – Gwer8km, Qty 2ScopeEPC for the Pipeline from LANAZ Refinery to Main Export Pipeline of KPC, including Hot taping activities and metering Skids.
- 43LANAZ Refinery Extension Project 2023Erbil – Gwer4 Storage Tanks.ScopeLANAZ Refinery – EPC for 4 Storage tanks 25,000m³, and EPC for interconnecting piping activates (8,000 Inch Dia) and the Pipe Racks 550 Ton of steel.
- 44United Refining CompanyErbil – Qushtabah7 Storage TanksScopeFabrication & Installation of 7 Storage Tank 1350m³
- 45United Refining CompanyErbil – Qushtabah7 Storage TanksScopeFabrication & Installation of 7 Storage Tank 2500m³
- 46United Refining CompanyErbil – Qushtabah6 Storage TanksScopeFabrication & Installation of 6 Storage Tank 6000m³
- 47KAR GroupKalak Area800mlScopeZab River Crossing 36", Fit up, welding, Concrete Casing, and River crossing about 800ml
- 48KAR GroupPardarash Area400mlScopeKhazir River Crossing 36", Fit up, welding, Concrete Casing, and River crossing about 400ml
- 49United Refining CompanyErbil – Qushtabah80TonScopeFabrication, Installation of Steel Structural Pipe rack.
- 50Hot tapBasrah, Rumailah2 PcsScopeHot tapping operation of point size 8"/12"
- 51Water Pipe Line (Hemn Group)Erbil67kmScopeExecution of 67km Water Pipeline with all the required activities.
- 52KPC GroupKalak Area550mlScopeZab River Crossing 36", Concrete Casing, and River crossing about 550ml
- 53Erbil Copper & Cable – EECErbil, Qushtabah1 Storage TanksScopeEngineering, Procurement, Fabrication & Installation of Gasoline Storage Tank 2200m³, with all accessories and FF system and Connections